Xu, Y. (2025) “Key Pathway Analysis of Hospital Engineering Cost Control Based on Whole-Process Management”, Journal of Progress in Civil Engineering, 7(5), pp. 22–25. doi: 10.53469/jpce.2025.07(05).04.